You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Air di Kebon Kosong Rampung
....
photo Anita Karyati - Beritajakarta.id

Channels Construction at Angkasa Pura Complex Completed

Central Jakarta Water Resources Sub-agency (SDA) has completed water channels construction project on Angkasa Pura Housing Complex road, RW 06, Kebon Kosong Urban Village, Kemayoran.

There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells

Kemayoran Sub-district SDA Executing Unit Head, Supriyadi said, it was carried out on August 13 and was completed on September 24. Around the location, it would be followed by the construction of infiltration wells.

"There are two works on Angkasa Pura Housing Complex road, namely normalizing water channels and making infiltration wells," he expressed, Wednesday (9/29).

October, Water Channel Construction on Jalan Kikir Completed

He stated, the channel was built as rainwater often overflows onto the road when it rains heavily. It was made to 45.5 meters length with bottom width around 95 centimeters and upper width around 130 centimeters and one meter height.

"We do it manually using an excavator plus nine officers for maximum results," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing